Custom Plush MOQ and Lead Time
Check the design, quantity, materials, packaging, and delivery date before setting the production schedule.
- ✓ Standard MOQ from 100 pcs
- ✓ Samples: usually 7-10 days
- ✓ Bulk: usually 15-25 days after approval
Plan Quantity and Timing Together
Schedule factors: Design readiness, materials, embroidery or printing, packaging, quantity, and delivery date.
Confirmation: Check these details against the approved sample and current production schedule.
Send Order DetailsMOQ and Lead-Time References
Planning only: These are not guarantees. Final timing depends on artwork, materials, revisions, decoration, accessories, packaging, quantity, season, inspection, and shipping.
Standard MOQ
Starts at 100 pcs; final quantity depends on the project.
Sample Days
Usually after the main details are confirmed.
Bulk Days
Usually after sample approval.
Final Schedule
Set after design, quantity, packaging, and delivery needs are checked.
What Changes the Schedule
A simple pillow may use less factory time than a mascot with clothing, embroidery, accessories, tags, retail packaging, and carton labels.
Sample Approval
Before bulk: Approve shape, size, fabric, embroidery, labels, and packaging.
Design Complexity
Adds work: Complex shapes, clothing, accessories, and small parts. Send clear artwork, sizes, and views.
Material Availability
Risk: Custom colors or special fabrics. Confirm the fabric early.
Embroidery and Printing
Adds setup: Detailed embroidery, thread colors, placement notes, and fabric or detail printing.
Order Quantity
Needs: Production-line planning, materials, packing space, and reorder expectations.
Packaging Complexity
Adds steps: Gift or blind boxes, retail packs, SKUs, and carton labels. Confirm before bulk.
Peak Season
Plan earlier: Busy seasons tighten schedules, especially for fixed deadlines.
Destination Market
Check: EU, UK, US, or retail rules for labels, documents, packing, and review.
Shipping Preparation
Confirm: Carton labels, compression limits, delivery windows, and warehouse appointments.
Plan MOQ with the Product
Standard: MOQ starts at 100 pcs for custom plush projects.
Also affected by: Structure, materials, embroidery setup, cutting, packaging, and cartons.
Why: Quantity changes fabric sourcing, patterns, embroidery setup, sewing-line planning, packing materials, and carton use.
- Product type, target size, and estimated quantity
- Artwork or reference image
- Fabric preference and detail requirements
- Packaging requirements, destination country, and fixed deadline if any
Plan Sampling Before Bulk Production
Sample: Usually 7-10 days after the main details are confirmed; files, fabrics, decoration, accessories, and packaging can change timing.
Bulk: Usually 15-25 days after sample approval. The approved sample guides materials, cutting, sewing, filling, finishing, inspection, packing, and shipping preparation.
Before bulk: Approve the sample, packaging, labels, and carton information.
View Production ProcessFirst Orders, Reorders, and Fixed Dates
First orders, reorders, multi-style orders, and orders with fixed event dates need different production planning.
Send Enough Detail to Check the Schedule
Before quoting or scheduling, send:
Check MOQ and Timing
Include artwork, target size, quantity, packaging, destination, and required delivery date.
Request Schedule Review